This Save-A-Lot parking lot located
on the Halls Ferry circle has just been completely sealcoated and striped,
10/23 - 10/24/05. There are a total of three businesses located within the
strip mall. The parking lot is pie shaped and was divided in half before
sealcoating and stripping could begin. This provided minimal disruption to
the traffic and business. The parking is roughly 50,000 sq ft and was
completed in just two days.
In the two pictures above you can
see how grey the parking lot looks and the lines have almost disappeared.
The next step is to
block off the parking lot and move the traffic to one side. Once this is
done the sealcoating can begin. The sealer is being applied with a sprayer.
A three person crew is used. The crew rotates threw out the day sealcoating,
driving the truck, and assisting where needed.
On the morning of day
two before the businesses open the newly sealcoated parking lot is stripe.
Traffic is then routed to the newly striped side and the other side is
sealcoated.
Our work is completed.
The parking lot has been sealcoated and all the lines have been painted.
This parking lot has had a complete face lift from the sealcoating and
striping. We wish the business owners the best of luck and feel their bottom
line will improve with the bright fresh new look.
Competitive Pricing
We will match any written bid on your driveway.
Appointments
Schedule your appointment on the hour. You won't have to wait around all day for one of our
crews to arrive.
Guarantee
When sealant is applied to structurally sound asphalt, we guarantee the
our materials and
workmanship for a full year on driveways under normal use conditions.
Seen it on TV? Find it at As Seen On TV Network! Click Here
This web site was designed and maintained by JP Enterprises. You may
contact us for your own site at sales@cjsealing.com